Pipe jacking method statement pdf

Pipe jacking is a specialist tunnelling method for installing underground pipelines with the minimum surface disruption. After the drillhead avn has reached the target pit on the other side of the obstacle, the drillhead is disassembled from the jacking pipes. Jacking force is transmitted from thrust wall installed in the drive shaft. This method has been developed for the pipe long and curved jacking in soft cray, sand and weak. An introduction to pipe jacking and microtunnelling.

Method statement for excavation works quality assurance. The jacking method of installation, therefore, is very efficient. The tunnel will be driven from the shaft 02 work site located in the southeast corner of junction 11 of the motorway. Pipe jacking is a trenchless technology method for installing a prefabricated pipe through the ground from a drive shaft to a reception shaft. Pipe ramming sometimes also called pipe jacking is a trenchless method for installation of steel pipes and casings. Introduction pipe jacking is the oldest method of trenchless technology. Feb 20, 2017 powerpoint video introduction to pipe jacking and microtunnelling. Pipe jacking and utility tunneling methods in trenchless construction. Stay clear from any mobile parts of the jacking rig iii. In addition, our products are produced and inspected in compliance with the zp wn 295 certification programme, which in part includes significantly higher demands than en 295. Attached to the front of the rods is a cutting head and transmitter, which is controlled by a locator to achieve the correct line and level required.

Limbs crushed by moving parts of the jacking rig 3 3 9 ii. Sir, can you give all the method statements for civil works in a pdf format from raft to finishing works of a structure. Trenchless installation minimizes costs and impacts on the environment and the population. Pipe jacking and utility tunneling methods in trenchless. Jan 22, 2014 at the start of the project, in most projects i joined with, one of the activities shall be implemented or started first is excavation. Purpose the purpose is intended to assist the client, customer installer in understanding the. The horizontal directional drilling process the tools and techniques used in the horizontal directional drilling hdd process are an outgrowth of the oil well drilling industry. The advantages and disadvantages of the gallery techniques heading apply also to the manned working pipe jacking method. Method statement for pipejacking shaft 01 to shaft 02 introduction this method statement covers the design and construction of the pipejacked tunnel, crossing. The drive shaft consists of jacks, that moves the pipe. Pipe jacking is a name for a method to excavate a tunnel by pushing pipe into. Method statement 6 free templates in pdf, word, excel.

Download free printable method statement samples in pdf, word and excel formats. View notes 50176417methodstatementpipejacking from constructi constructi at cairo university. Jacking pipes, as opposed to pipes laid in open excavations, are subjected to both jacking forces and external earth loads and both of these have to be considered when specifying the pipes. The resulting video inspection of the culvert can then be viewed by. Powerpoint video introduction to pipe jacking and microtunnelling. Below method statement describes in detail the welding process for pipe work and the welders qualification test procedures. Pipe ramming is a trenchless method for installation of steel pipes and casings over distances usually up to 150 ft up long and up to 55inches in diameter, although the method can be used for much longer and larger installations. The effect of the jacking force on the pipe barrel is mostly small on account of the high compressive strength of the concrete. Request pdf developing a risk assessment method for complex pipe jacking construction projects pipe jacking pj construction is a highly complex and uncertain process so that performing an. Hobas grp pipe systems can be found in the transmission of drinking water, in sewage applications and irrigation, in hydropower plants as well as in trenchless applications. Concrete pipe association of australasia jacking design. Factorymade pipe sections are jacked or pushed behind the tunnel boring machine or other tunnel excavation methods. Distribution statement pipe jacking, pipe ramming, horizontal boring, horizontal directional drilling hdd, trenchless construction, guided boring no restrictions. Method statement for excavation works quality assurance and.

Comparison has been done based on preconstruction and construction direct and indirect cost. In this method, specially made pipes are driven into underground using hydraulic jacks. The driving takes place from a drive shaft to the reception shaft. Pipe jacking manned techniques unitracc underground.

Mar 03, 2017 stable soil face excavation may precede the jacking operation. Drainage services department pipe jacking microtunneling. In order to understand what we can provide you download and open one of our construction method statement by clicking this link. Some standards use an overly conservative rule of thumb where the designer simply selects an astm c76, class v, cwall pipe instead of analyzing the loads on the pipe to determine the necessary pipe strength.

This includes implementing the company commitments for achieving the best quality of welding works. The term pipe jacking can be used to describe a specific installation technique as well as a process applicable to other trenchless technology method. Pipe jacking 1 internet document pipe jacking ritchiewiki. Pipe jacking is primarily used as an alternative to open cut excavations or other tunneling methods. Still, only perfect pipes with thin walls, a smooth outer sourface, high stiffness and a suitable. May 21, 2012 trenchless installation minimizes costs and impacts on the environment and the population. Pipe jacking is a trenchless method of new pipe installation. Pipe jacking has been used to install concrete pipelines for drainage and sewerage projects throughout australasia since the late 1960s.

Variation of slurry pipe jacking force in coarse and fine soils. Developing a risk assessment method for complex pipe. Certification of our vitrified clay pipes steinzeugkeramo. Pipe jackingmicrotunnelling is a nondisruptive method of installing utility tunnels and conduits by thrusting pipes through the ground as controlled excavation. In the pipe jacking operation, jacks located in the drive shaft propel the pipe. I would like to know how to write a method statement for pipe jacking. Trenchless construction methods, and implementation support. Ensure the pipe invert and the decking is maintained clean, tidy and free from lubrication or slurry.

References concrete pipe association of australasia. The highdensity slurry pipejacking method has been shown. Method statement for excavation and back filling works. Pipe jacking method of tunnel construction pipe jacking method is used to construct tunnels under existing structures like road ways, railways etc. This construction method involves jacking a pipe behind a. Installation of the casing pipe by using an air hammer from a drive pit use openend casing for pipes 8 and use clean spoil from the casing after drive completed installation of a carrier pipe and filling annular space with grout. Pdf variation of slurry pipe jacking force in coarse and. All other rams must be approved by a all other rams must be approved by a competent person excluding the author. Method pertaining to directional drilling method the initial drill out is carried out using highpressure water through drill rods. Primarily used for new sewer construction it is also used for sewer replacement and relining, gas and water mains, oil pipelines, electricity and telecommunication installations, culverts and subways.

Standards for vitrified clay pipes are specified by en 295, parts 1 to 7. The research also identified the criteria to be considered in trenchless technology by highlight on the pipe jacking and horizontal directional drilling. All spoils removed through the inside of the pipe to the jacking pit. Mersings second strength and expertise is in pipe jacking, it is another trenchless method where pipe strings are being connected unit by unit from their launch shaft till it reaches the length and destination required. Figures 51, 52 and 53 illustrate how the principle of pipe jacking is applied to auger boring, microtunnelling, and a jacked underpass. Factorymade pipe sections are jacked or pushed behind the tunnel boring machine or other tunnel.

In contrast to the segment method of the mini tunnel system, the amount of grooving is. Distances of 30 m 150 feet or more and over 1,500 mm 60 inches in diameter are common, although the method can be used for much longer and larger installations. The term microtunnelling is also often used to describe this method of pipe installation. You may copy this method statement and submit to the engineer but please take a while to read your specification first as this may differ from it and revision will be needed. Microtunnelling technology since the conventional microtunnelling method by pipe jacking has been proven to be too costly for construction of small diameter and short length tunnels, the auger boring method has been developed in recent years as a simple and easytouse trenchless alternative. Introduction this method statement covers the procedure involved in handling and installation of underground grpfrp piping in trench. The jacking technique microtunnelling pipe jacking is a method of tunnel construction where hydraulic jacks are used to thrust specially made pipes through the ground behind a shield machine, from launch shaft to receival shaft. Drainage improvement works in ki lun tsuen, kwu tung, ma tso lung and sha ling nov 2008 to end 2011 this project involved laying of three numbers of 1,350mm1,650mm diameter drain pipes of total 40m long across the fan kam road at ying pun using pipe jacking method for minimizing the disturbance to the existing dongjiang watermains and the traffic flow of fan kam road. Contractor to conclude that the geotechnical statements made are. Pipe jacking association an introduction to pipe jacking and. Guidelines for pipe ramming trenchless data service. Where pipelines are laid at depths greater than five metres for.

Concrete pipe jacking is a method of installing pipelines without disrupting existing surface facilities or activities. Easy pipe a new technology for trenchless installation of. The tunnel comprises approximately 97 metres of 2100nb precast concrete jacking pipes. Pipe jacking and utility tunneling methods are types of trenchless construction methods, which involves the requirement of workers to enter. Compared to all other pipe methods of construction mentioned, the degree of mechanisation is highest and the safety risk is the lowest. Specification for microtunnellingpipe jacking construction. Microtunnellingpipe jacking construction unitywater.

1283 1690 831 437 1107 1288 194 346 61 917 943 356 794 1056 108 1218 255 44 30 272 942 801 321 1416 238 1439 1548 438 1314 1472 130 431 500 1346 635 347 1274